FRP Round Counterflow Tower
Rotomolded fiberglass shell, low noise fan, ideal for rooftops and tight plant rooms.
Counterflow, crossflow, closed-circuit and large industrial towers from 5 to 5,000 m³/h. Each unit is thermally selected against your wet-bulb, flow rate and approach — then molded, assembled and tested in our own works before it ships.
Specified by
From a single rooftop unit to a field-erected industrial tower — same thermal calculations, same material traceability, same after-sales file.
Rotomolded fiberglass shell, low noise fan, ideal for rooftops and tight plant rooms.
Modular FRP panels, easy site assembly, generous access for fill cleaning and inspection.
Sealed coil loop keeps process water clean — for chillers, furnaces and heat exchangers.
High-efficiency film fill and low-pressure spray nozzles for general industrial cooling.
Field-erected concrete and steel structures for power stations and heavy process plants.
Replacement fill, drift eliminators, fans, gearboxes and full thermal upgrades for old towers.
Most tower failures are selection errors, not manufacturing errors. We start with your duty point and work backwards.
Every quotation carries a calculation sheet: wet-bulb, range, approach, flow and fan power — signed by an engineer.
We mold our own shells and basins. No outsourced panels, no mismatched resin batches, no waiting on a third party.
Hydrostatic leak test at 1.5× design pressure, fan vibration check, and a full run-in on every assembled unit.
Fill, nozzles, drift eliminators and drive components stay available long after the warranty window closes.
Six industries, six different duty profiles. Selection rules change with them — ours are built around the application, not a single catalogue page.
Four stages, one engineer responsible for your file from first email to final handover.
You send flow, inlet/outlet temperature, wet-bulb, altitude and layout constraints. We flag anything that will hurt performance.
Selection report with tower size, fan power, pressure drop, water volume and a dimensioned general arrangement drawing.
Production schedule with weekly photo reports. Factory acceptance test with your inspector welcome on site.
Export packing, container loading plan, and remote or on-site commissioning support for the first start-up.
Six inspection hold points are signed off between raw material intake and container loading. You get the complete record — not a certificate that says “trust us”.
Send flow rate, temperatures and site conditions — we’ll return a selection and a budget price within two working days.